Once again thanks for PracticeDump for supporting me to get through OGEA-102 exam in first attempt. Useful dump!



It is known to all that our privacy should not be violated while buying OGEA-102 exam braindumps. Our company makes much account of the protection for the privacy of our customers, since we will complete the transaction in the Internet. Our company has made out a sound system for privacy protection (OGEA-102 exam questions & answers). First of all, our operation system will record your information automatically after purchasing OGEA-102 study materials, then the account details will be encrypted immediately in order to protect privacy of our customers by our operation system (OGEA-102 study materials), we can ensure you that your information will never be leaked out. In order to make customers feel worry-free shopping about The Open Group OGEA-102 dumps torrent, our company has carried out cooperation with a sound payment platform to ensure that the accounts, pass-words or e-mail address of the customer won't be leaked out to others.
Do you have the confidence to clear the exam without OGEA-102 study materials? Do you know how to prepare for the exam? And have you found any useful OGEA-102 exam questions for the exam? If your answer is "No" for these questions, congratulations, you have clicked into the right place, because our company is the trusted hosting organization refers to the OGEA-102 exam braindumps for the exam. With the help of our OGEA-102 dumps torrent, you can rest assured that you can pass the exam as well as obtaining the dreaming certification as easy as blowing off the dust, because our The Open Group OGEA-102 training materials are compiled by a large number of top exports who are coming from many different countries. OGEA-102 study materials in our page are the most useful exam preparation for the exam, which really deserves your attention surely.
In order to meet the interests of our customers, we will update our The Open Group OGEA-102 exam braindumps to cater to the demand of them regularly. Our experts will spare no effort to organize the latest information about the exam, and then they will compile these useful materials into our OGEA-102 study materials immediately. Therefore, we won't miss any core knowledge for the exam. What's more, we will provide many exam tips for you. There is no doubt that with the help of our OGEA-102 dumps torrent, it will be a piece of cake for you to pass the exam and get the certification. Customer satisfaction is our greatest pursuit. We will continue to update our OGEA-102 exam questions & answers, and to provide customers a full range of careful, meticulous, precise, and thoughtful after-sale services.
Undoubtly everyone wants to receive his or her The Open Group OGEA-102 exam braindumps as soon as possible after payment, and especially for those who are preparing for the exam, just like the old saying goes "Time is money & time is life and when the idle man kills time, he kills himself." Our OGEA-102 study materials are electronic exam materials, and we can complete the transaction in the internet, so our operation system only need a few minutes to record the information of you after payment before sending the The Open Group OGEA-102 dumps torrent to you by e-mail automatically. You can download and use our OGEA-102 training materials only after 5 to 20 minutes, which marks the fastest delivery speed in the field.
| Section | Objectives |
|---|---|
| Topic 1: Architecture Development Method (ADM) Application | - Preliminary Phase and Architecture Framework Application - Architecture Vision and Stakeholder Management |
| Topic 2: Architecture Implementation and Governance | - Migration Planning - Implementation Governance - Architecture Change Management - Opportunities and Solutions |
| Topic 3: Business, Information Systems, and Technology Architecture | - Technology Architecture and Infrastructure Considerations - Business Architecture Development and Analysis - Data and Application Architecture Design |
1. Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect to an international supplier of engineering services and automated manufacturing systems. It has three manufacturing plants where it assembles both standard and customized products for industrial production automation. Each of these plants has been operating its own planning and production scheduling systems, as well as applications and control systems that drive the automated production line.
The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are based on the TOGAF Standard. The CIO sponsors the Enterprise Architecture.
During a recent management meeting, a senior Vice-President highlighted an interview where a competitor company ' s CIO is reported as saying that their production efficiency had been improved by replacing multiple planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in a central data center. Some discussion followed, with the CIO responding that the situations are not comparable, and the current architecture is already optimized.
In response, the Architecture Board approved a Request for Architecture Work covering the investigations to determine if such an architecture transformation would lead to improvements in efficiency. You have been assigned to support the architecture team working on this project.
A well-known concern of the plant managers is about the security and reliability of driving their planning and production scheduling from a remote centralized system. Any chosen system would also need to support the current supply chain network consisting of local partners at each of the plants.
Refer to the scenario
You have been asked to explain how you will initiate the architecture project.
Based on the TOGAF Standard, which of the following is the best answer?
A) You would research vendor literature and conduct a series of briefings with vendorsthat are on the current approved supplier list. Based on the findings from theresearch, you would define a preliminary Architecture Vision including summaryviews, high-level requirements, and high-level definitions of the baseline and targetenvironments from a business, information systems, and technology perspective.
Youwould then use that to build consensus among the key stakeholders.
B) You would hold a series of interviews at each of the manufacturing plants using thebusiness scenarios technique. This will allow you to understand the systems andintegrations with local partners. You would use stakeholder analysis to identify keyplayers in the engagement, and to understand their concerns. You will then identifyand document the key high-level stakeholder requirements for the architecture. Youwill then generate high level definitions of the baseline and target architectures.
C) You would develop baseline and target Architectures for each of the manufacturingplants, ensuring that the views corresponding to selected viewpoints address keyconcerns of the stakeholders. A business case, together with performance metricsand measures should be defined to ensure the architecture meets the businessneeds. A consolidated gap analysis between the architectures will then validate theapproach and determine the capability increments needed to achieve the target state.
D) You would conduct a pilot project that will enable vendors to demonstrate potentialoff-the-shelf solutions that address the concerns of the stakeholders. Running a pilotproject will save time and money later in the process. Based on the findings of thatpilot project, a complete set of requirements can then be developed that will drive theevolution of the architecture. Once the requirements are completed, a formalstakeholder review should be held, and permission sought to proceed to develop thetarget architecture.
2. Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a multinational automotive manufacturer.
The company has a corporate strategy that focuses on electrification of its portfolio, and it has invested heavily in a new shared car platform to use across all its brands. The company has four manufacturing facilities, one in North America, two in Europe, and one in Asia.
A challenge that the company is facing is to scale up the number of vehicles coming off the production line to meet customer demand, while maintaining quality. There are significant supply chain shortages for electronic components, which are impacting production. In response to this the company has taken on new suppliers and has also taken design and production of the battery pack in-house.
The company has a mature Enterprise Architecture practice. The TOGAF standard is used for developing the process and systems used to design, manufacture, and test the battery pack. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new battery pack into production, adjustments to the assembly processes need to be made. A pilot project has been completed at a single location. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for implementation and migration at each plant.
Draft Architecture Contracts have been developed that detail the work needed to implement and deploy the new processes for each location. The company mixes internal teams with a few third-party contractors at the locations. The Chief Engineer has expressed concern that the deployment will not be consistent and of acceptable quality.
Refer to the scenario
The Lead Enterprise Architect has asked you to review the draft Architecture Contracts and recommend the best approach to address the Chief Engineer ' s concern.
Based on the TOGAF Standard, which of the following is the best answer?
A) For changes requested by an internal team, you recommend a memorandum of understandingbetween the Architecture Board and the implementation organization. For contracts issued to third-party contractors, you recommend that it is a fully enforceable legal contract. You recommend thatthe Architecture Board reviews all deviations from the Architecture Contract and considers whether togrant a dispensation to allow the implementation organization to customize the process to meet theirlocal needs.
B) You recommend that the Architecture Contracts be used to manage the architecture governanceprocesses across the locations. You recommend deployment of monitoring tools to assess theperformance of each completed battery pack at each location and develop change requirements ifnecessary. If a deviation from the contract is detected, the Architecture Board should allow theArchitecture Contract to be modified meet the local needs. In such cases they should issue a newRequest for Architecture Work to implement a modification to the Architecture Definition.
C) You review the contracts ensuring that they address project objectives, effectiveness metrics,acceptance criteria, and risk management. Third-party contracts must be legally enforceable. Yourecommend a schedule of compliance reviews at key points in the implementation process. Yourecommend that the Architecture Board reviews all deviations from the Architecture Contract andconsiders whether to grant a dispensation to allow the process to be customized for local needs.
D) For changes undertaken by internal teams, you recommend a memorandum of understandingbetween the Architecture Board and the implementation organization. If a contract is issued to acontractor, you recommend that it is a fully enforceable legal contract. If a deviation from theArchitecture Contract is found, you recommend that the Architecture Board grant a dispensation toallow the implementation organization to customize the process to meet their local needs.
3. Please read this scenario prior to answering the question
You are employed as an Enterprise Architect working within the Enterprise Architecture (EA) team at an electric vehicle manufacturer. The company focuses on designing, manufacturing, and advancing battery technology for sustainable transportation. The goal of the company is to build the best technology and software platform to support self-driving cars.
An architecture to support strategy has been completed defining a long-term Target Architecture with a roadmap over five years. This has identified the need for a portfolio of projects over the next two years. The portfolio includes development of an advanced driver assistance system using data gathered from multiple vehicles on the road.
The design of the presentation and accessibility of different types of data that the company plans to offer through its platform is challenging. It is important for the application portfolio to work securely with third- party cloud services, and V2X (Vehicle-to-Everything) service providers across many countries in order to effectively manage large amounts of data. Stakeholders are particularly concerned about the security of V2X.
Regulations in various markets mandate that user privacy must always be safeguarded, to prevent tracking and compiling of data that could reveal the drivers ' journey.
The company follows the TOGAF standard as the basis for its Enterprise Architecture practice and uses the purpose-based EA Capability model as described in the TOGAF Series Guide: A Practitioners ' Approach to Developing Enterprise Architecture Following the TOGAF ADM. The EA team reports to the Chief Information Officer (CIO), who is the sponsor of the EA program.
You have been assigned to lead the architecture development effort for the driver assistance system. A security resource plan and a vision for a security-specific architecture design have been completed. You have a meeting with the EA team leader to talk about the progress of your work.
Refer to the scenario
You have been asked how you will address risk and security at this stage of the architecture project.
Based on the TOGAF standard which of the following is the best answer?
A) Since data is being shared across multiple service providers, a security federation should be established.
This includes contractual arrangements, and a definition of the responsibility areas for the data exchanged, as well as security implications. Assets with the same security criteria should be grouped together so they can be managed under one security policy. A risk assessment should be carried out to determine the risks relevant to specific data assets.
B) A qualitative risk assessment should be carried out for the data assets exchanged with the service providers. This will deliver a set of priorities, high to medium to low, based on identified threats, the likelihood of occurrence, and the impact. Using the priorities, a Business Risk Model can then be developed detailing the risk strategy including classifications to determine what mitigation is sufficient.This model can then used to determine the risk strategy for the company.
C) A trust framework should be established with the third parties required for the travel assistance systems.
This will describe the relationship with each party and establish the foundation for secure cloud operations. Digital certificates should be a key part of the framework and will be used to create trust between the parties. Regular monitoring for legal and regulatory changes across all the countries should occur to keep the trust framework in compliance.
D) Data quality is a key factor in risk management. The datasets that need to be safeguarded should be identified. For each dataset, ownership and responsibility for the quality of data should be assigned. A security classification will be defined and applied to each dataset. The dataset owner will then be able to authorize processes that are trusted for a certain activity on the dataset under specific circumstances.
4. Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a multinational automotive manufacturer.
The company has a corporate strategy that focuses on electrification of its portfolio, and it has invested heavily in a new shared car platform to use across all its brands. The company has four manufacturing facilities, one in North America, two in Europe, and one in Asia.
A challenge that the company is facing is to scale up the number of vehicles coming off the production line to meet customer demand, while maintaining quality. There are significant supply chain shortages for electronic components, which are impacting production. In response to this the company has taken on new suppliers and has also taken design and production of the battery pack in-house.
The company has a mature Enterprise Architecture practice. The TOGAF standard is used for developing the process and systems used to design, manufacture, and test the battery pack. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new battery pack into production, adjustments to the assembly processes need to be made. A pilot project has been completed at a single location. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for implementation and migration at each plant.
Draft Architecture Contracts have been developed that detail the work needed to implement and deploy the new processes for each location. The company mixes internal teams with a few third-party contractors at the locations. The Chief Engineer has expressed concern that the deployment will not be consistent and of acceptable quality.
Refer to the scenario
The Lead Enterprise Architect has asked you to review the draft Architecture Contracts and recommend the best approach to address the Chief Engineer ' s concern.
Based on the TOGAF Standard, which of the following is the best answer?
A) For changes requested by an internal team, you recommend a memorandum of understandingbetween the Architecture Board and the implementation organization. For contracts issued to third-party contractors, you recommend that it is a fully enforceable legal contract. You recommend thatthe Architecture Board reviews all deviations from the Architecture Contract and considers whether togrant a dispensation to allow the implementation organization to customize the process to meet theirlocal needs.
B) You recommend that the Architecture Contracts be used to manage the architecture governanceprocesses across the locations. You recommend deployment of monitoring tools to assess theperformance of each completed battery pack at each location and develop change requirements ifnecessary. If a deviation from the contract is detected, the Architecture Board should allow theArchitecture Contract to be modified meet the local needs. In such cases they should issue a newRequest for Architecture Work to implement a modification to the Architecture Definition.
C) You review the contracts ensuring that they address project objectives, effectiveness metrics,acceptance criteria, and risk management. Third-party contracts must be legally enforceable. Yourecommend a schedule of compliance reviews at key points in the implementation process. Yourecommend that the Architecture Board reviews all deviations from the Architecture Contract andconsiders whether to grant a dispensation to allow the process to be customized for local needs.
D) For changes undertaken by internal teams, you recommend a memorandum of understandingbetween the Architecture Board and the implementation organization. If a contract is issued to acontractor, you recommend that it is a fully enforceable legal contract. If a deviation from theArchitecture Contract is found, you recommend that the Architecture Board grant a dispensation toallow the implementation organization to customize the process to meet their local needs.
5. Please read this scenario prior to answering the question
You are the Chief Enterprise Architect at a large food service company specializing in sales to trade and wholesale, for example, restaurants and other food retailers.
One of your company ' s competitors has launched a revolutionary product range and is running a very aggressive marketing campaign. Your company ' s resellers are successively announcing that they are not interested in your company ' s products and will sell your competitor ' s.
The CEO has stated there must be significant change to address the situation. He has made it clear that new markets must be found for the company ' s products, and that the business needs to pivot, and address the retail market as well as the existing wholesale market.
A consideration is the company ' s ability and willingness to change its business model, and if it is a temporary or permanent change. An additional risk factor is one of culture. The company has been used to a stable business with a reasonably well known and settled client base - all with its own local understandings and practices.
The CEO is the sponsor of the EA program within the company. You have been engaged with the sales, logistics, production, and marketing teams, enabling the architecture activity to start. An Architecture Vision, Architecture Principles, and Requirements have all been agreed. As you move forward to develop a possible Target Architecture you have identified that some of the key stakeholders ' preferences are incompatible. The incompatibilities are focused primarily on time-to-market, cost savings, and the need to bring out a fully featured product range, but there are additional factors.
Refer to the scenario
You have been asked how you will address the incompatibilities between key stakeholder preferences.
Based on the TOGAF standard which of the following is the best answer?
A) You would review the Stakeholder Map and ensure that you have addressed and represented theconcerns of all department heads. You will involve them in resolving the incompatibilities.TheCommunications Plan should include a report that summarizes the key features of the architecturewith and how incompatibilities were resolved to reflects the stakeholders ' requirements.You willcheck with each key stakeholder they are satisfied with how the incompatibilities have been resolved.
B) You recommend that since the CEO has stated that the company must pivot, it is better tocompromise on a full product range rather than time-to-market. You would develop just enough of theTarget Architecture to demonstrate fitness of the proposed approach. You would limit the descriptionto just where there is a gap between the current baseline. You would seek approval by thestakeholders to move forward with developing the Target Architecture in detail.
C) You would seek to understand value preferences and priorities of the stakeholders. You woulddevelop alternative Target Architectures, highlighting the gaps between current state and thealternatives. You would consider combining features from one or more alternatives in collaborationwith the stakeholders.
A formal stakeholder review should then be held to decide which alternative isfit for purpose and should be moved forward with. You will then secure the funding required.
D) You would use the Architecture Vision, Principles, and Requirements to define a set of criteria foralternatives and create a set of architecture views to illustrate the impact of the alternative TargetArchitectures. You would identify the impact on planned projects. You would understand the strengthsand weaknesses of the alternatives. You would conduct a formal stakeholder review to decide whichalternative to move forward with. You will determine the funding required.
Solutions:
| Question # 1 Answer: B | Question # 2 Answer: C | Question # 3 Answer: A | Question # 4 Answer: C | Question # 5 Answer: D |
PracticeDump confidently stands behind all its offerings by giving Unconditional "No help, Full refund" Guarantee. Since the time our operations started we have never seen people report failure in the exam after using our OGEA-102 exam braindumps. With this feedback we can assure you of the benefits that you will get from our OGEA-102 exam question and answer and the high probability of clearing the OGEA-102 exam.
We still understand the effort, time, and money you will invest in preparing for your The Open Group certification OGEA-102 exam, which makes failure in the exam really painful and disappointing. Although we cannot reduce your pain and disappointment but we can certainly share with you the financial loss.
This means that if due to any reason you are not able to pass the OGEA-102 actual exam even after using our product, we will reimburse the full amount you spent on our products. you just need to mail us your score report along with your account information to address listed below within 7 days after your unqualified certificate came out.
Once again thanks for PracticeDump for supporting me to get through OGEA-102 exam in first attempt. Useful dump!
This dumps is worthy to buy. I pass exam. Certainly it is latest. very useful. If you want to pass exam I advise you to buy.
Bundle of thanks for converting certification exams into success. My friend urged me to use PracticeDump OGEA-102 pdf exam guide for training before my exam.
This OGEA-102 certification is very important for my company. And i passed the OGEA-102 exam with your help. Yesterday i was informed to have a rise by my boss. I feel so happy! Thank you sincerely!
OGEA-102 dump is good for me. I will have a good chance about this certification. Thanks to the dump.
I passed OGEA-102 exam braindumps last week. And i want to suggest that you if you want to pass, you should study as they said at least 3 days.
I took the exam today and passed!
Great site! Just passed OGEA-102 exam.
Actual questions! I passed OGEA-102!
Wow, your OGEA-102 questions are the actual questions.
Thank you team. Just passed OGEA-102 exam and had same questions from your dumps!
I am very tired of the OGEA-102 exam test, but your online test engine inspires me interest for the test. It is very valid and helpful for my exam test. Thanks.
PracticeDump OGEA-102 practice questions are a big helper in my preparation.
Over 36542+ Satisfied Customers
PracticeDump Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
We are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
If you prepare for the exams using our PracticeDump testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
PracticeDump offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.